Shoreline & Seawall Services

Kirby’s Trucking and Excavating specializes in shoreline restoration and seawall construction to protect your waterfront and keep it looking good. We combine durable materials and expert craftsmanship to preserve your property’s value and natural beauty.

Approval Process: Some projects can require permits from the Ohio Department of Natural Resources (ODNR) and/or the Army Corps of Engineers for waterfront modifications.

Average Project Timeline: Typical shoreline restorations take 1–3 weeks, depending on the extent of erosion and access conditions.

Required Equipment: (Can Include but not limited to) Excavators, skid steers, barges (if on water), and riprap or stabilization materials.

Seasonality: Best completed late spring through early fall when water levels are stable and ground access is optimal.

Process Summary: Kirby’s restores eroded shorelines by rebuilding the land base and reinforcing it with rock or seawall structures. The process improves stability, prevents future erosion, and enhances property aesthetics while turning otherwise unusable or inaccessible space into a beautiful property addition.

Approval Process: Can require ODNR or Army Corps permitting for any permanent shoreline alteration in Ohio.

Average Project Timeline: Projects typically take 1–2 weeks, depending on wall length and soil or water conditions.

Required Equipment: (Can Include but not limited to) Excavators with vibratory hammers, pile drivers, welding tools, and barges for water access.

Seasonality: Best installed May through October during low-water conditions for safer, faster installation.

Process Summary: Kirby’s Trucking and Excavating drives interlocking steel sheet panels into the shoreline to form a strong, erosion-resistant barrier. Backfilling and capping ensure long-term durability, creating a permanent solution to protect property from waves and erosion.

rock seawall.jpg

Approval Process: Generally requires local or ODNR permits, especially for projects along public waterways.

Average Project Timeline: Construction averages 1–2 weeks, depending on wall height and stone availability.

Required Equipment: (Can Include but not limited to) Excavators, skid steers, stone lifts, compaction tools, and drainage materials.

Seasonality: Optimal between spring and fall, when water levels are low and ground stability is high.

Process Summary: This process involves excavating the shoreline, installing a gravel base, and stacking interlocking stone or concrete blocks for support. Drainage and backfill materials are added to prevent hydrostatic pressure. The result is a durable, natural-looking seawall that blends aesthetics and functionality.

Aquatic Retaining Walls

decorative seawall.jpg

Approval Process: May require ODNR and Army Corps of Engineers authorization for submerged or semi-submerged structures.

Average Project Timeline: Typically completed in 1–2 weeks, depending on design and material type.

Required Equipment: (Can Include but not limited to) Excavators, compaction equipment, marine-grade materials, and erosion-control fabric.

Seasonality: Best built during dry, low-water seasons, usually late spring through early fall.

Process Summary: Kirby’s constructs aquatic retaining walls to stabilize underwater or shoreline slopes using durable stone, concrete, or steel materials. These structures control erosion, manage water flow, and enhance shoreline longevity while preserving aquatic ecosystems.

shoreline Rip rap

shoreline riprap.jpg

Approval Process: May require ODNR or local approval for shoreline modification.

Average Project Timeline: Typically takes 3–7 days, depending on shoreline length and rock size.

Required Equipment: (Can Include but not limited to) Excavators, loaders, and haul trucks for transporting and placing riprap stone.

Seasonality: Best installed late spring through early fall, when water levels are manageable and ground is firm.

Process Summary: Rip rap installation involves grading the shoreline and placing layers of large rock or stone to absorb wave energy and prevent erosion. Kirby’s Trucking and Excavating uses high-quality materials and proper layering techniques to ensure long-lasting shoreline protection and natural appearance.

Dredging

Approval Process: May require Army Corps of Engineers and ODNR permits for sediment removal or waterway modification.

Average Project Timeline: Small dredging projects take 3–7 days, while larger lake or pond dredges can last several weeks.

Required Equipment: (Can Include but not limited to) Excavators, dredge pumps, barges, and silt management systems.

Seasonality: Most effective summer through early fall, when water levels and weather conditions are stable.

Process Summary: Dredging removes accumulated sediment, restoring depth and water flow for ponds, lakes, and shorelines. Kirby’s Trucking and Excavating uses specialized equipment to safely extract and dispose of material, improving water quality and preventing further buildup.